Statistics

by

please check attached

Sheet1

Never use plagiarized sources. Get Your Original Essay on
Statistics
Hire Professionals Just from $11/Page
Order Now Click here

Problem 1, 10 points

The failure rate for a product is 0.0000005395 units per hour and the design engineers believe that it

is steady from 100 hours to 80,600 hours of product life. If you only wanted to replace 0.0223539132 proportion

of the product due to warranty claims: 1) how long would your warranty period be, 2) what would you do

about the fact that the rate of failure is not steady until after 100 hours of operation, and 3) briefly, (one or two

short sentences) discuss what else you would put in the warranty relative to reliability?

Problem 2, 15 points

step 1 step 2 step 3 step 4

0.9617868549 0.9725931267 0.96248938 0.9642791018

R10000 R11000 R12000 R10000

0.9758152675

R9000

0.9635922685

R10000

What is the R10000 reliability of the above system? A signal travels from left to right and, in step two, can go through any of the three

units working in parallel.

Problem 3, 38 points 0.3015302977

Design engineers have set product specifications at 60 mm/sec +/-.8 mm/sec. You know that product which measures

+/- .8 mm/sec from the mean costs the company an extra $ 33.02 per unit. You also know that it will cost you $ 9.9 per unit to adjust

a product to 60 mm/sec. You also know that your process is a 3 sigma process and the mean is 0.45 SD less than

the target. The firm accepts Taguchi’s loss function as a viable means of modeling costs. How much is your

process 1) currently costing you if you do nothing, 2) if you fix those that make sense to fix? Would you spend 8.2061211909 million

dollars to create a centered process with a Cp ranging from 1.5 to 2? If you did have such a process, would you adjust or not adjust

(support using Taguchi’s cost function)? Production is 108092 units per month (accrue monthly), costs $5000 per month to

inspect each unit, productive life cycle of the product is projected to be 4.9045908932 years, and the discount rate is expected to range from

9% to 15%APR. Support your answer both quantitatively (95% CL, n = 50) and qualitatively (six stake holder consideration).

Problem 4 (3 points)) What decision do you make relative to control charts when you know the costs of Type I and Type II errors?

Problem 5 (2 points) What is the purpose of step 18 in the process of creating a QCP?

Problem 6, 38 points takt time is 2.6031 minutes, work 24/7/365 30.4166666667 days in a month

Specifications are .5″. +/- .001 inches, it costs 450.77 dollars when product is below the lower tolerance and 65.08 dollars

labor and $100 per .001 inch to bring those above the upper tolerance to 1 SD below tolerance. The SD of the process is 0.0002895995 .

I can also change the system to a 5 to 6 sigma process for 2.6030605954 million dollars. The organization accrues monthly, has a discount

rate that varies between 10 and 15% APR, looks only 3 years into the future on any project, is spending an additional $7000/month to inspect the

product, if put in the new system will spend only $2000 to control the process, currently the machine is set to produce a mean that is on target.

Is there a business rule you could change currently to save money with the system as is, and what should that rule be if there is one? Should

you alter the system to reduce the SD, show your answer as a 95% confidence interval using a sample of 50. Do not forget to judge your decision

from the perspectives of all stakeholders.